Home  |   Infrastructure Summit — Sept 27–28   |    EV Fleets — Nov 2   |    Blog   |  
Talk to a live rep: 888-409-4418
Thu, March 21, 2024   |   1:05 pm – 2:05 pm

Dig It: Site Installation and Considerations

Back

Installing EV charging stations at your residential, commercial, or municipal site can be an incredible opportunity to increase cash flow and reap numerous value-creation opportunities. However, not every site is shovel-ready.  New installations require careful planning, permitting, and design. This session will dive into site analysis, security requirements, infrastructure planning, power requirements, environmental integration, and installation.

Join us for this fundamental session to learn:

  • Evaluating your site and assessing charging types for capacity needs
  • How to coordinate early with the local utilities to verify power demarcation and pathways to the charger locations
  • Guiding principles for site selection, feasibility, and design decisions for your region
  • Proactive subsurface damage prevention measures
  • Assessing population, density factors, and local income rates that could impact your site
Looking forward to this session? Share it!

SPEAKERS

Chris Foley
Westwood Professional Services
Chris Foley
Regional Survey Service Leader
Westwood Professional Services
David Revette
Dewberry Engineers Inc.
David Revette
Professional Engineer
Dewberry Engineers Inc.
John Incorvaia
GPRS, LLC
John Incorvaia
Market Segment Leader
GPRS, LLC
Terms and Conditions | Privacy Policy